Project: FPT Tower
Owner: FPT Land Ltd.
Location: 89 Lang Ha street, Dong Da distric, Ha Noi
Project: 3 basements, 27 floating floors, total area 2.400m2
Items: Constructing 3 basements
- Diaphragm wall : B800 (D=25m)
- Installing Barrette: B800, B1000, B1200 (Depth from 40m to 50m)
Value of contract: 75 billion VND
Starting: 2009
Finishing: 2012